
Al Schultz on Friday had cordoned off the roughly 4-foot wide hole that appeared in a roadside ditch and covered the opening with wood planks. Schultz didn't have a clear solution to the problem.
"I called about three excavation companies and with the holiday got one to come out and look at it," he said. "We tied a truck hitch to his rope and threw it down there."
But the contractor's rope was too short and the hitch dangled somewhere down the hole, Schultz said. To reach the bottom, Schultz tied another length of rope to the contractors' rope.
They measured 82 feet.
But just what it looked like down there, they didn't know, and Schultz couldn't get a quote for the fix at the time.












Comment: