© Jared Rodriguez / t r u t h o u t; Adapted: futureatlas.com, US Coast Guard
A former contractor who worked for British Petroleum (BP) claims the oil conglomerate broke federal laws and violated its own internal procedures by failing to maintain crucial safety and engineering documents related to one of the firms other deepwater production projects in the Gulf of Mexico, according to internal emails and other documents obtained by Truthout.
The whistleblower, whose name has been withheld at the person's request because the whistleblower still works in the oil industry and fears retaliation, first raised concerns about safety issues related to BP
Atlantis, the world's largest and deepest semi-submersible oil and natural gas platform, located about 200 miles south of New Orleans, in November 2008.
Atlantis, which began production in October 2007, has the capacity to produce about 8.4 million gallons of oil and 180 million cubic feet of natural gas per day.
It was then that the whistleblower, who was hired to oversee the company's databases that housed documents related to its
Atlantis project, discovered that the drilling platform had been operating without a majority of the engineer-approved documents it needed to run safely, leaving the platform vulnerable to a catastrophic disaster that would far surpass the massive oil spill that began last week following a deadly explosion on a BP-operated drilling rig.
BP's own internal communications show that company officials were made aware of the issue and feared that the document shortfalls related to
Atlantis "could lead to catastrophic operator error" and must be addressed.
Indeed, according to an August 15, 2008, email sent to BP officials by Barry Duff, a member of BP's Deepwater Gulf of Mexico Atlantis Subsea Team, the Piping and Instrument Diagrams (P&IDs) for the
Atlantis subsea components "are not complete" and "there are hundreds if not thousands of subsea documents that have never been finalized, yet the facilities have been" up and running. P&IDs documents form the foundation of a hazards analysis BP is required to undertake as part of its Safety and Environmental Management Program related to its offshore drilling operations. P&IDs drawings provide the schematic details of the project's piping and process flows, valves and safety critical instrumentation.
"The risk in turning over drawings that are not complete are: 1) The Operator will assume the drawings are accurate and up to date," the email said. "This could lead to catastrophic Operator errors due to their assuming the drawing is correct," said Duff's email to BP officials Bill Naseman and William Broman. "Turning over incomplete drawings to the Operator for their use is a fundamental violation of basic Document control, [internal standards] and Process Safety Regulations."
BP did not respond to repeated requests for comment for this story. Despite the claims that BP did not maintain proper documentation related to
Atlantis, federal regulators authorized an expansion of the drilling project.
Last May, Mike Sawyer, a Texas-based engineer who works for Apex Safety Consultants, voluntarily agreed to evaluate BP's
Atlantis subsea document database and the whistleblower's allegations regarding BP's engineering document shortfall related to
Atlantis. Sawyer concluded that of the 2,108 P&IDs BP maintained that dealt specifically with the subsea components of its Atlantis production project, 85 percent did not receive engineer approval.
Even worse, 95 percent of
Atlantis' subsea welding records did not receive final approval, calling into question the integrity of thousands of crucial welds on subsea components that, if they were to rupture, could result in an oil spill 30 times worse than the one that occurred after the explosion on
Deepwater Horizon last week.
In a report Sawyer prepared after his review, he said BP's "widespread pattern of unapproved design, testing and inspection documentation on the
Atlantis subsea project creates a risk of a catastrophic incident threatening the [Gulf of Mexico] deep-water environment and the safety of platform workers." Moreover, "the extent of documentation discrepancies creates a substantial risk that a catastrophic event could occur at any time."
"The absence of a complete set of final, up-to-date, 'as built' engineering documents, including appropriate engineering approval, introduces substantial risk of large scale damage to the deep water [Gulf of Mexico] environment and harm to workers, primarily because analyses and inspections based on unverified design documents cannot accurately assess risk or suitability for service," Sawyer's report said. He added, "there is no valid engineering justification for these violations and short cuts."
Sawyer explained that the documents in question - welding records, inspections and safety shutdown logic materials - are "extremely critical to the safe operation of the platform and its subsea components." He said the safety shutdown logic drawings on
Atlantis, a complex computerized system that, during emergencies, is supposed to send a signal to automatically shut down the flow of oil, were listed as "requiring update."
"BP's recklessness in regards to the
Atlantis project is a clear example of how the company has a pattern of failing to comply with minimum industry standards for worker and environmental safety," Sawyer said.
The oil spill blanketing roughly 4,000 square miles in the Gulf of Mexico after the
Deepwater Horizon explosion, which killed eleven workers, was exacerbated, preliminary reports suggest, by the failure of a blowout preventer to shut off the flow of oil on the drilling rig and the lack of a backup safety measure, known as a remote control acoustic shut off switch, to operate the blowout preventer.
Congressman Henry Waxman, chairman of the Committee on Energy and Commerce,
sent a letter Thursday to BP Chairman and President Lamar McKay seeking documents related to inspections on
Deepwater Horizon conducted this year and BP's policy on using acoustic shut off switches in the Gulf of Mexico.
The circumstances behind the spill are now the subject of a
federal investigation.
Profits Before SafetyWhether it's the multiple oil spills that emanated from BP's Prudhoe Bay operations in Alaska's North Slope or the March 2005 explosion at the company's Texas refinery that killed 15 employees and injured 170 people, BP has
consistently put profits ahead of safety.
On October 25, 2007, BP
pled guilty to a criminal violation of the Clean Water Act and paid a $20 million fine related to two separate oil spills that occurred in the North Slope in March and August of 2006, the result of a severely corroded pipeline and a safety valve failure. BP formally entered a guilty plea in federal court on November 29, 2007. US District Court Judge Ralph Beistline sentenced BP to three years probation and said oil spills were a "serious crime" that could have been prevented if BP had spent more time and funds investing in pipeline upgrades and a "little less emphasis on profit."
Also on October 25, 2007, BP paid a $50 million fine and
pleaded guilty to a felony in the refinery explosion. An investigation into the incident concluded that a warning system was not working and that BP sidestepped its own internal regulations for operating the tower. Moreover, BP has a
prior felony conviction for improperly disposing of hazardous waste.
In 2007, the Department of Interior's federal Minerals Management Services (MMS), the agency that monitors offshore drilling practices,
fined BP $41,000 for not properly training employees in well control management related to a near blowout due to a rise in gas pressure on the
Ocean King Rig five years earlier that forced the evacuation of all 65 workers for two days and halted drilling for a week.
According to MMS, Diamond Offshore Drilling, operator of the rig, and BP did not know that the critical safety procedures they employed to try and stop the increase in gas pressure on the Ocean King Rig could also have caused a blowout.
"Operator failed to verify employees were trained to competently perform the assigned well control duties,"
MMS said. "Additionally, they failed to have a remote-controlled station that could operate the valves in the flow and vent lines of the diverter. These violations contributed to a loss of well control event on November 14, 2002. There was no pollution or injuries."
MMS also cited BP and contract workers in the incident for what they said was a 'lack of knowledge of the system, and lack of pre-event planning and procedures."
Additionally, MMS
fined BP $25,000 in February 2004 for another incident that took place a year earlier on the Diamond Offshore drilling rig. MMS said "the rig's Gas Detection System was bypassed with ongoing drilling operations being conducted."
In July 2004, BP was
fined $190,000 by MMS due to a fire that occurred two years earlier "involving the as-built diverter system [on another rig] leading to damage to property and the environment."
"The diverter system was not installed as in the approved plan, had inadequate supports, added right angle turns at the ends, and did not provide for downwind diversions," MMS said.
In 2003, MMS
fined BP $70,000, this time due to inadequate water pressure on the fire protection system on one rig. BP racked up a separate $80,000 fine that year as well for "bypassed relays for the pressure safety... for four producing wells."
That's similar to "what caused the near-blowout in 2002,"
according to environmental publication
Clean Skies.
And the list goes on.
BP was also
fined $25,000 in 2003 by MMS because a drilling rig operator "failed to conduct crane dismantling and removal operations in a safe and workmanlike manner, resulting in the crane falling into the Gulf of Mexico. Accident occurred due to failure to follow the procedures established in the Job Safety Analysis (JSA)."
Finally, BP was fined $20,000 by MMS the same year because a "surface-controlled subsurface safety valve...was blocked out of service."
The incident involving
Deepwater Horizon, now the subject of a federal investigation, may end up being the latest example of BP's safety practices run amuck.
The issues related to the repeated spills in Prudhoe Bay and elsewhere were revealed by more than 100 whistleblowers who, since as far back as 1999, said the company failed to take seriously their warnings about shoddy safety practices and instead retaliated against whistleblowers who registered complaints with superiors.
In September 2006, days before BP executives were scheduled to testify before Congress about an oil spill from a ruptured pipeline that forced the company to shutdown its Prudhoe Bay operations,
BP announced that it had tapped former federal Judge Stanley Sporkin to serve as an ombudsman and take complaints from employees about the company's operations.
That's who the whistleblower complained to via email about issues related to BP's
Atlantis operations in March 2009 a month after his contract was abruptly terminated for reasons he believes were directly related to his complaints to management about BP's failure to obtain the engineering documents on
Atlantis and the fact that he "stood up for a female employee who was being discriminated against and harassed." The whistleblower alleged that the $2 million price tag was the primary reason BP did not follow through with a plan formulated months earlier to secure the documents.
"We prepared a plan to remedy this situation but it met much resistance and complaints from the above lead engineers on the project," the whistleblower wrote in the March 4, 2009, email to Pasha Eatedali in BP's ombudsman's office.
Federal InterventionAdditionally, he hired an attorney and contacted the inspector general for the Department of the Interior and MMS and told officials there that BP lacked the required engineer-certified documents related to the major components of the
Atlantis subsea gas and oil operation.
In 2007, MMS had approved the construction of an additional well and another drilling center on
Atlantis. But the whistleblower alleged in his March 4, 2009, email to Eatedali in BP's Office of the Ombudsman that documents related to this project needed to ensure operational safety were missing and that amounted to a violation of federal law as well as a breach of BP's
Atlantis Project Execution Plan. The ombudsman's office agreed to investigate.
MMS, acting on the whistleblower's complaints, contacted BP on June 30, 2009, seeking specific engineering related documents. BP complied with the request three weeks later.
On July 9, 2009, MMS requested that BP turn over certification documents for its Subsurface Safety Valves and Surface Controlled Subsea Safety Valves for all operational wells in the Atlantis field. MMS officials flew out to the platform on the same day and secured the documents, according to an internal letter written by Karen Westall, the managing attorney on BP's Gulf of Mexico Legal Team.
But according to the public advocacy group
Food & Water Watch, a Washington, DC-based nonprofit, which became involved in the case last July, BP did not turn over a complete set of materials to MMS.
"BP only turned over 'as-built' drawings for [
Atlantis'] topsides and hull, despite the fact that the whistleblower's allegations have always been about whether BP maintains complete and accurate engineer approved documents for it subsea components," Food & Water Watch said in a 19-page letter it sent to William Hauser, MMS's Chief, Regulations and Standards Branch.
During two visits to the
Atlantis drilling platform last August and September, MMS inspectors reviewed BP's blowout preventer records. Food & Water Watch said they believe MMS inspectors reviewed the test records and failed to look into the whistleblower's charges that engineering documents were missing. The blowout preventer, however, is an issue at the center of the
Deepwater Horizon spill.
An MMS spokesperson did not return calls for comment.
Last October, Food & Water Watch filed a Freedom of Information Act (FOIA) request for expedited processing, seeking documents from MMS that indicate BP "has in its possession a complete and accurate set of 'as built' drawings ... for its entire
Atlantis Project, including the subsea sector." "As-built" means lead engineers on a specific project have to make sure updated technical documents match the "as-built" condition of equipment before its used.
MMS denied the FOIA request.
"MMS does not agree with your assessment of the potential for imminent danger to individuals or the environment, for which you premise your argument [for expedited response]. After a thorough review of these allegations, the MMS, with concurrence of the Solicitor's Office, concludes your claims are not supported by the facts or the law," the agency said in its October 30, 2009, response letter.
In response, MMS said that although some of its regulatory requirements governing offshore oil and gas operations do require "as built" drawings, they need not be complete or accurate and, furthermore, are irrelevant to a hazard analysis BP was required to complete.
Unsatisfied with MMS's response, Food & Water Watch contacted Rep. Raul Grijalva (D-Arizona), a member of the Committee on Natural Resources and chairman of the subcommittee on National Parks, Forests and Public Lands, about the issues revolving around BP's
Atlantis operations and provided his office with details of its own investigation into the matter.
"Unsubstantiated" ClaimsOn January 15, Westall, the BP attorney, wrote a letter to Deborah Lanzone, the staff director with the House Subcommittee on Energy and Minerals, and addressed the allegations leveled by Food & Water Watch as well as indirect claims the whistleblower made.
Westall said BP "reviewed the allegations" related to "noncompliant documentation of the
Atlantis project ... and found them to be unsubstantiated." But Westall's response directly contradicts the findings of Billie Pirner Garde, BP's deputy ombudsman, who wrote in an April 13 email to the whistleblower that his claims that BP failed to maintain proper documentation related to
Atlantis "were substantiated" and "addressed by a BP Management of Change document." Garde did not say when that change occurred. But he added that the whistleblower's complaints weren't "unique" and had been raised by other employees "before you worked there, while you were there and after you left."
Westall noted in her letter that "all eight BP-operated Gulf of Mexico production facilities" received safety awards from MMS in 2009.
"Maintenance and general housekeeping were rated outstanding and personnel were most cooperative in assisting in the inspection activities," MMS said about BP's Gulf of Mexico drilling facilities. "Platform records were readily available for review and maintained to reflect current conditions."
Westall maintained that the whistleblower as well as Food & Water Watch had it all wrong. Their charges about missing documents has nothing to do with
Atlantis' operational safety. Rather, Westall seemed to characterize their complaints as a clerical issue.
"The
Atlantis project is a complex project with multiple phases," Westall said in her letter to Lanzone. "The [August 15, 2008] e-mail [written by Barry Duff, a member of the
Atlantis subsea team] which was provided to you to support [Food & Water Watch's] allegations relates to the status of efforts to utilize a particular document management system to house and maintain the
Atlantis documents. The document database includes engineering drawings for future phases, as well as components or systems which may have been modified, replaced, or not used."
But Representative Grijalva was not swayed by Westall's denials. He continued to press the issue with MMS, and in February, he and 18 other lawmakers signed a letter calling on MMS to probe whether BP "is operating its
Atlantis offshore oil platform ... without professionally approved safety documents."
Grijalva said MMS has not "done enough so far to ensure worker and environmental safety at the site, in part because it has interpreted the relevant laws too loosely."
"[C]ommunications between MMS and congressional staff have suggested that while the company by law must maintain 'as-built' documents, there is no requirement that such documents be complete or accurate," the letter said. "This statement, if an accurate interpretation of MMS authorities, raises serious concerns" and requires "a thorough review at the agency level, the legal level and the corporate level. The world's largest oil rig cannot continue to operate without safety documentation. The situation is unacceptable and deserves immediate scrutiny.
"We also request that MMS describe how a regulation that requires offshore operators to maintain certain engineering documents, but does not require that those documents be complete or accurate, is appropriately protective of human health and the environment."
On March 26, MMS launched a formal investigation and is expected to file a report detailing its findings next month.
Zach Corrigan, a senior attorney with Food & Water Watch, said in an interview Thursday that he hopes MMS "will perform a real investigation" and if the agency fails to do so, Congress should immediately hold oversight hearings "and ensure that the explosion and mishap of the Horizon platform is not replicated."
"MMS didn't act on this for nearly a year," Corrigan said. "They seemed to think it wasn't a regulatory or an important safety issue.
Atlantis is a real vulnerability."