OF THE
TIMES
The plant reached cold shutdown on August 23, 2012, and the source of RCS leakage was confirmed to be from micro-cracks in the alloy 600 diaphragm for the upper pressurizer heater bundle. This heater bundle was subsequently replaced with a bundle that contained a stainless steel, non-alloy 600 heater diaphragm. An NRC specialist inspector, who was deployed to the site, confirmed the source of the RCS leakage and monitored pressurizer heater replacement activities. The licensee subsequently conducted extent-of-condition inspections on the other two pressurizer heater bundles and no indications of leakage were identified. The inspectors determined that the licensee's post-installation and extent-of-condition inspections were acceptable.It's not yet clear whether the same pump or part failed today.
Comment: Sounds like now is a good time to be buying up pork, salting and smoking it. And canning it.